Analysis ofelectrical output from the power plat working in the middle of town
Hrubý, Radek ; Brno,, Luděk Ondroušek - Teplárny (referee) ; Matoušek, Antonín (advisor)
The work focuses on outlet of the electrical power from power plants operating in urban areas. After a short analysis of the general possibility of leading out electric power from power plants of various types, thesis continues to describe of outlet electrical power from PPC Červený Mlýn. Subsequently, are calculated short-circuit conditions in the main switching station. It follows an analysis of power lines. The last part dealt with the issue of reliability of sources in connection with random transition processes in the electrical network and the light of the operational reliability of electrical power equipment.
Analysis of parallel operation of nodal areas of 110 kV Krasikov and Neznasov transformers stations
Kostkan, Petr ; Kopička, Marek (referee) ; Ptáček, Michal (advisor)
Currently, the nodal areas of Neznášov substation and Krasíkov substation, which belong to ČEZd distribution network 110 kV – East, are operand as separate units. In the defined setting, each nodal area comprises of two 400/110 kV transformers. In the case of failure of the transformer T401 or T402, the criterion N-1 for twenty percent of the rated output is not met. Such problem can be solved by parallel operation of nodal areas of Neznášov substation and Krasíkov substation. The principal as well as practical aim of this thesis is to interconnect the bridge operated connection in separated areas into parallel/loop operation of nodal areas (supplied by 400/110 kV transformers). Computing software is used to calculate the steady state and short-circuit conditions in the distribution network 110 kV for separate and parallel operation of mentioned nodal areas. Power flow analysis is aimed at assessment and evaluation of voltage conditions, transformers loading (400/110 kV and 110/vn) as well as 110 kV lines loading. Obtained short-circuit indices is used to examine short-circuit, withstand capability of the 110 kV substation. Finally, benefits as well as drawbacks of the separate and parallel operation are compared and evaluated. If necessary, the technical arrangements are proposed/designed in order to allow parallel operation of nodal areas Neznášov substation and Krasíkov substation.
Steady state and short-circuit conditions within E.ON 110 kV power network at parallel operation of nodal areas of Otrokovice substation and Sokolnice substation
Mikulinec, René ; Janda, Petr (referee) ; Blažek, Vladimír (advisor)
This thesis deals with the steady operation and short-circuit conditions in the 110 kV network E.ON in a separate and parallel operation of nodal areas of Otrokovice substation and Sokolnice substation. The theoretical part is devoted to the calculation of steady state high-voltage systems using Newton's iterative method, transient phenomena that may occur in the power system short-circuit calculations and theories. The practical part deals with the actual calculations of steady state and short-circuit conditions in a separate and parallel operation of nodal areas Sokolnice-Otrokovice, which were calculated using the dispatching program. These calculations are then evaluated for possible use of involvement in actual operation. At the end there are suggestions on operational measures in the network 110 kV.
Stabilized operation and short-circuit conditions within E.ON 110kV power network supplied from Otrokovice 110kV switching station, during the period of 2012
Kuba, Petr ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
This thesis deals with steady running and short-circuit conditions in the 110 kV network, E. ON, fed from 110 kV Otrokovice. Substation Otrokovice ensures system transformation from 400 kV to 110 kV system through three transformers. In order to increase reliability of power supply and improved economy is considered to bridge the transition from the operation of two transformers in bridge operations of the three transformers. However, this brings with it significant worsening of short-circuit conditions in the 110 kV network. The task of this work is to evaluate and compare the two variants of operation in terms of steady running and short-circuit conditions in the network at 110 kV and then implement operational and technical measures. The introduction describes the electricity system and its parts. The theoretical part of the paper discusses ways of dealing with steady running and short circuit conditions of long lines. Practical part will deal with applications of knowledge on the network. The conclusion summarizes the most relevant information and the results assessed both variants.
Program for the calculation of short - circuit conditions in a power system
Bucholcer, Oto ; Václavík, Vlastimil (referee) ; Blažek, Vladimír (advisor)
This master's thesis consists of three parts. The theoretical part deals with short-circuit conditions in the electricity supply system and with the method of their calculation. The practical part includes the programming process of a programme; description of programme properties and functionality. The third part contains the verification of an accurate programme calculation of the examples.
Design the Transformer Station for the Outgoing Power of Cogeneration Unit
Pastorek, Jaroslav ; Procházka, Aleš (referee) ; Orságová, Jaroslava (advisor)
The thesis deals with the design of a transformer station for the outgoing power of cogeneration unit with an electric capacity of up to 1 MW. The thesis describes the design procedure of individual devices such as a transformer with a nominal ratio 22/0,4 kV, high voltage switchgears and low voltage switchgears. With the proper selection of the transformer, along with the technical parameters, the economic benefits that come from its purchasing and operating costs with the transformer operation are also considered. Based on this, the economic comparison of selected types of oil transformers during 20 years is also developed. Another part of the thesis deals with HV and LV switchgears, which are dimensioned according to shortcircuit conditions in the transformer station. In conclusion this work deals with the grounding of a transformer station and design protection in accordance PPDS.
Steady state and short-circuit conditions in 110kV E.ON network fed from Čebín transformer station
Krutiš, Petr ; Janda, Petr (referee) ; Blažek, Vladimír (advisor)
Master’s thesis deals with computation of steady state and short-circuit conditions in 110 kV nodal area of Čebín. The first part of thesis is theoretical. There is described computation of steady state and short-circuit conditions. There is description of 110 kV nodal area of Čebín too. There are made computations in the practical part. Two types of operation of transformers T401 and T402 are evaluated. The transformers operate independent at first, then they are connected in parallel. Voltage conditions in substations, load of lines and transformers, power losses and short-circuit resistance of substations in 110 kV nodal area of Čebín are evaluated based on the computations. There are compared the both types of operation of transformers in the end of practical part.
Steady state and short-circuit conditions within E.ON 110kV power network at parallel operation of transformers T403 and T402 in 400/100kV transformer stations Sokolnice and Otrokovice
Doležal, Marek ; Foltýn,, Daniel (referee) ; Blažek, Vladimír (advisor)
This master’s thesis is divided into two logical parts. The first part contains theory of calculation of steady state and short-circuits conditions within 110 kV distribution network. Newton’s method and short-circuit current calculation is also explained here. It also deals with classification and aftereffects of transient performance occurring in power networks. The second part contains practical calculation of steady flow and short-circuit conditions at parallel operation of transformers T403 and T402 in 400/110 kV transformer stations Sokolnice and Otrokovice. This calculation is done with program used by system operators called SINAUT Spectrum and consequently analyzed. This part also contains brief description of substations from this region.
The calculation of 110 kV network distance protection relays setings.
Bartoš, Petr ; Vaculík, Petr (referee) ; Toman, Petr (advisor)
This master’s thesis is about setting of distance protections. The first part is focused on a brief analysis of the basic types of failures and distance protections tripping characteristics and their co-operation with automatic re-turn. The most extensive theoretical chapter is devoted to specific influences that negatively affect the proper operation of distance protections. The practical part is about calculation of symmetrical short-circuit and dissymmetrical short-circuit conditions with consideration of fault resistance and the actual calculation settings of distance protections. Calculations of short-circuit conditions and setting of distance protections are made on a specific part of the network of E.ON in area Prostejov, which is supplied from the substation 400/110 kV Otrokovice.
Steady state and short-circuit conditions within E.ON 110 kV power network at parallel operation of nodal areas of Čebín substation and Sokolnice substation
Múdry, Peter ; Rampl, Martin (referee) ; Blažek, Vladimír (advisor)
In the distribution network 110 kV of E.ON Company there are the nodal areas of Čebin substation and Sokolnice substation which are operated separately at the present time. There is one 400/110 kV transformer for each nodal area. In case of fault on one of these transformers or on busbar in which the set transformer is working, it comes to an outage of electric supply in the set nodal area. This problem has to be solved with help of the parallel operation of nodal areas of Čebín substation and Sokolnice substation. The main and also the practical task of this work is to design the bridge connection appropriate for parallel operation of nodal areas (supply transformers 400/110 kV). With help of a computing program there were made calculations of steady state and short-circuit conditions in distribution network 110 kV for separated and parallel operation of nodal areas. Voltage conditions, load of transformers (400/110 kV and 110/vn kV) and conditions on 110 kV lines are evaluated and controlled as the result of steady state calculations. Based on short-circuit conditions there is controlled the short-circuit resistance of the substations. Finally there are compared advantages and disadvantages of separated and parallel operations of nodal areas. If necessary, technical arrangements required for introduction of parallel operation of nodal areas of Čebín substation and Sokolnice substation will be designed. The theoretical part of the work deals with calculation of steady state with help of iterative methods, namely Newton´s and Gauss-Seidel methods. There are further described the method of calculating short-circuit currents, characteristic values and time behaviours of short-circuit current.